A disaster recovery and business continuity plan says how long each system may be down (RTO), how much data you can lose (RPO), and what people do while it is down. For a cloud startup, it fits on one page: critical systems, targets, backups, failover steps, who decides, and how you tell customers.

Below: what the Google Cloud London incident shows, how to set RTO and RPO, which architecture each target needs, and a template.

What happened in europe-west2, and why it matters

On 20 October 2026, Google Cloud’s London region (europe-west2) had a disruption that lasted 6 hours and 8 minutes, according to Google’s incident page. Google reports the times in US/Pacific: 23:00 on 19 October to 05:08 on 20 October, which is 06:00 to 12:08 UTC. Most server logs store Unix timestamps in UTC; to line them up with the incident window, a Unix timestamp converter from our free tool site Toolgu shows each value in UTC and local time.

The facts in Google’s preliminary report, as of 25 October 2026:

  • A power grid disruption hit the data centre that hosts zone europe-west2-b. Both the primary and backup controllers failed to start the emergency generators, and the UPS batteries ran out.
  • Workloads that ran only in europe-west2-b became unreachable.
  • Some customers in zones europe-west2-a and europe-west2-c, which had no power problem, also saw impact. Google names demand surges and control-plane dependencies across zones as causes.
  • About 40 services were listed as affected, including Compute Engine, Cloud SQL, GKE, Cloud Storage and Persistent Disk.

Two lessons for small teams. A data centre with backup generators can still lose power, so one zone is one point of failure. And the other zones in the region were not fully isolated from it. Your plan needs to say what you do when the region itself is degraded.

Illustrative image: a small tech team running a recovery drill with a printed runbook and a laptop
A recovery plan only counts once the team has tested it against the clock.

Disaster recovery vs business continuity

  • Disaster recovery (DR) is technical: restore systems and data after an outage, a deletion, a bad deploy or a ransomware attack.
  • Business continuity (BC) is wider: keep the business running while systems are down. Who talks to customers, how support works without the admin panel, which manual workaround keeps orders moving.

A startup needs one plan that covers both: the first hour of an outage is mostly decisions and communication, not commands.

NIST SP 800-34 Rev. 1, the US government contingency planning guide, describes seven steps: write a policy, run a business impact analysis, add preventive controls, choose recovery strategies, write the plan, test and train, and keep the plan up to date. It is written for federal systems, but the steps scale down well.

RTO and RPO in disaster recovery

Google Cloud’s DR planning guide defines them like this:

  • RTO (recovery time objective): the longest your application may be offline.
  • RPO (recovery point objective): the longest period of data you may lose in a major incident. A 15-minute RPO means you accept losing the last 15 minutes of writes.

The same guide makes the trade-off clear: the smaller the RTO and RPO, the more the application costs to run. So set them per system, not for the whole company. A checkout or payments API may need minutes. An internal reporting dashboard can often wait a day.

To set them, ask the business: “If this is down for four hours on a Monday morning, what happens?” Lost revenue, contract penalties, support load. That is a business impact analysis in its simplest form.

Single zone, multi-zone, multi-region or multi-cloud

Each step up covers a wider class of failure and costs more money and operational work. For the design work inside one region (redundancy, failover and health checks), see our high availability architecture guide.

  • Single zone. One failure domain. A zone outage, like europe-west2-b, takes you down until the zone recovers or you restore elsewhere.
  • Multi-zone (regional). Instances and managed databases spread over two or three zones in one region. Managed regional services handle the failover. It does not help when the whole region is degraded.
  • Multi-region. A second region holds your data and some or all of your stack. AWS’s disaster recovery whitepaper describes four patterns, from cheapest to most complex: backup and restore, pilot light (data replicated, servers off), warm standby (a smaller running copy) and multi-site active/active.
  • Multi-cloud. The workload can run on two providers. It protects against a provider-wide failure, and doubles your infrastructure code, monitoring and security work. For most startups, a second region plus backups stored outside the provider is the better trade-off. Our vendor lock-in guide shows how to keep an exit to another provider affordable without running two stacks.

RTO/RPO tier table

Use this to map each system to an architecture. The times are typical planning ranges, not guarantees; your own tests decide what you can really meet.

Tier Example systems Target RTO Target RPO Architecture
0: critical Checkout, payments, login, core API Minutes Seconds to minutes Multi-zone, plus warm standby or active/active in a second region, with continuous replication
1: important Customer dashboard, admin panel, search 1 to 4 hours Up to 15 minutes Multi-zone, plus pilot light in a second region: data replicated, servers deployed from infrastructure as code on failover
2: standard Internal tools, reporting, analytics 1 business day Up to 24 hours Multi-zone where cheap, cross-region backups, restore by script
3: deferrable Marketing site, archives, test environments Several days Last good backup Single zone is fine, backups plus the code to rebuild

The AWS whitepaper makes one point many teams miss: replication is not a backup. Continuous replication copies corruption and deletions too. Every tier still needs point-in-time backups.

Backups: the 3-2-1 rule, adapted for the cloud

CISA’s backup options paper states the 3-2-1 rule: keep 3 copies of important files (1 primary and 2 backups), on 2 different media types, with 1 copy offsite. In cloud terms:

  • 3 copies: the production database, automated snapshots or point-in-time recovery, and an exported backup.
  • 2 different media: different storage services or, better, a different account. A snapshot in the same project as the database dies with a compromised admin account.
  • 1 offsite: another region, and for the data you cannot lose, a second provider or a storage account with its own credentials.

Also keep what you need to rebuild: infrastructure as code, secrets (in a separate vault), DNS records and the CI/CD pipeline. AWS notes that without infrastructure as code, a restore in a new region is slow and error-prone.

If you hold personal data of EU residents, this is not only good practice. GDPR Article 32 asks for the ability to restore availability and access to personal data in a timely manner after a physical or technical incident, and for a process to test those measures regularly. This is general information, not legal advice.

Runbooks and disaster recovery testing

A plan that has never been run is a guess. Google’s DR guide recommends regular tests and checking that permissions in the recovery environment match production. A practical schedule:

  1. Monthly: restore test. Restore last night’s database backup into a scratch environment and run a check query. Record how long it took. That number is your real RTO for a restore.
  2. Quarterly: tabletop exercise. One hour, one scenario (“our main region is degraded for six hours”). Walk through the runbook. Write down every “we don’t know”.
  3. Twice a year: failover drill. Fail a tier 0 or tier 1 system over to the second region in a staging copy, then fail back.
  4. After every incident or big architecture change: update the plan.

A runbook is a numbered list of steps that someone tired can follow at 03:00: how to confirm the outage, the decision rule for failover, the exact commands or pipeline jobs, how to check it worked, and how to fail back. Keep a copy outside the systems it describes. If your wiki runs in the failed region, the runbook is down too.

The communication plan

Decide in advance:

  • Who declares an incident and leads it. One person decides.
  • Internal channel for the incident, plus a fallback if your chat tool is down.
  • Status page hosted outside your main stack, with update templates written in advance.
  • Update rhythm, for example every 30 to 60 minutes until resolved, even when there is no news.
  • Direct contacts: large customers, payment partners, your cloud provider’s support.
  • Afterwards: a short, blameless review: timeline, cause, changes.

Disaster recovery and business continuity plan template

Copy this one-page template into a shared document. If a line stays empty, that is your first task.

Section What to write
1. Scope and owner Systems covered, plan owner, last review date
2. Critical systems Each system with its tier (0 to 3), RTO and RPO
3. Dependencies Cloud regions and zones, third-party APIs, DNS, identity provider, payment provider
4. Backups What is backed up, how often, where (account and region), retention, last restore test date and duration
5. Recovery strategy Per tier: multi-zone, pilot light, warm standby or active/active
6. Runbooks Link to each runbook, plus where the offline copy lives
7. Roles and contacts Incident lead, deputy, technical responders, provider support contacts
8. Decision rules When to fail over, when to wait, who approves
9. Communication Status page, update templates, customer and partner contact list, update rhythm
10. Business workarounds Manual processes while systems are down: orders, support, invoicing
11. Testing Restore test, tabletop and failover drill dates and results
12. Review Changes after each incident or test

FAQ

What are RTO and RPO in simple terms?

RTO is how long a system may be down. RPO is how much recent data, measured in time, you can afford to lose.

Is multi-zone enough for cloud disaster recovery?

For many tier 2 and 3 systems, yes. For systems that must survive a degraded region, add a second region and test the failover.

How often should we test our disaster recovery plan?

Test restores monthly, run a tabletop exercise each quarter, and run a failover drill at least twice a year and after major changes.

Next step

This week: tier your systems, check that each production database runs across zones with point-in-time recovery, copy backups to another region and account, and time one restore test. If you are still choosing a stack, our SaaS MVP tech stack guide explains why a managed database with regional failover is easier to recover. Fast, safe patching depends on the same pipeline; our vulnerability prioritization guide sets the fix times. If nobody on the team owns infrastructure, that gap is one reason startups bring in a fractional CTO.

Our cloud and DevOps service covers backup design, infrastructure as code, multi-region setups and restore drills. If the RTO you need and the RTO your tests show are far apart, send us the filled-in template and we will tell you which changes close the gap first.

Keep reading

Get new guides in your inbox

One practical email when we publish something worth your time. No spam; unsubscribe with one click.